India
- Home
- Wireless Regulatory
- India
India - Wireless Regulatory Services
Ministry of Communications and Information Technology
We have an excellent working relationship with the Wireless Regulatory Authority of India , officials at Communications Ministry of Communications and Information Technology India . We can ensure that your application for Wireless Regulatory Services from Wireless Regulatory Authority of India (TRAI) is processed fast and without undue complications. Wireless Regulatory Authority of India , Which Regulate the telecommunication devices. We have done multiple Wireless Regulatory Services in India for various manufactures and Labs and we have a specific employee in country to handle all your Wireless Regulatory Services needs
Services Offered
We always deliver the shortest lead time and efficient customer centric services.
- Identify the required certification on a case to case basis depending on the product.
- Provide pre-compliance testing during the design and development phase to determine compliance
- Checking documentation and samples (if required) before submission to ensure that there are no delays after submission.
- Handle complete document submission process.
- Payment of government fees in the local currency
- Regular follow up with the authority to track the process.
- Submission on regular status update to the client to keep them informed.
- Support of renewals of previous applications.
Specifications
Authority : Ministry of Communications and Information Technology
Type approval certificate : Mandatory
Marking/Label Requirements : No
Sample Requirement : No
Average Lead time for type approval : 3 Weeks
Local Representative : Yes
Approval validity : 1 Year
Test reports : CE reports (RF, EMC, Safety, SAR), CE DoC
Test standards : EN 300 328, EN 301 893, EN 301 908,EN 301 489, EN 60950, EN 62368, EN 62479, EN 62311,EN 300 400, TBR 21,TBR 38
We offer services for the devices:
Cellular (2G/3G/4G/5G)
Other Wireless Devices
Tablets
Keyless Entry
RFID
Short Range Devices
Vehicle Radar
Certificate Example
News
Request for Public Feedback on Adopting TSDSI Standard “A Generic Relay Architecture for 5G and Beyond” as a National Standard – INDIA
Authorities are inviting public comments on the proposed adoption of the TSDSI standard titled "A Generic Relay Architecture for 5G and Beyond" as a national...
TRAI Issues Directives to Access Providers on Measures to Prevent Misuse of Headers and Content Templates Under TCCCPR, 2018 – INDIA
The Telecom Regulatory Authority of India (TRAI) has issued new directives to access providers aimed at preventing...
TRAI releases The Indian Telecom Services Yearly Performance Indicators 2023-2024 – INDIA
The Telecom Regulatory Authority of India (TRAI) has released its comprehensive report titled "The Indian Telecom Services Yearly Performance Indicators...
TRAI Directs Access Providers to Disconnect and Blacklist Unregistered Spam Callers Under TCCCPR, 2018 – INDIA
The Telecom Regulatory Authority of India (TRAI) has issued a directive mandating access providers to disconnect and blacklist unregistered spam callers...
TRAI Unveils Updated Quality of Service Standards for Access and Broadband Services – INDIA
The Telecom Regulatory Authority of India (TRAI) has announced new and updated Quality of Service (QoS) standards for access and broadband services...
Extension of Mandatory Certification Dates: Amendments to Phase III and Phase IV MTCTE Notification – INDIA
Amendment Notification: Extension of Mandatory Certification Date for 10 Products under MTCTE
Exemption Pertaining to Various Parameters/ Interfaces of ERs under MTCTE-reg- INDIA
The India Telecommunication Engineering Centre (TEC) announced a generic exemption from submission of test reports for below mentioned test parameters/ Interfaces pertaining to various ERs under MTCTE has been extended upto
TEC Launches Online Certification Modules for Voluntary Certification Scheme- INDIA
The Telecom Engineering Center (TEC) announces a paradigm shift in its certification procedures, accepting only online applications for testing and certifying telecom products under its Voluntary Certification scheme, effective from January 1, 2024.
TEC extends deadline for MTCTE phase III AND IV- INDIA
The Telecommunication Engineering Centre (TEC) issued amendments to extend the deadline for mandatory certification of MTCTE Phase III and IV products.
TEC Announces New Phase V Products – INDIA
The Telecommunication Engineering Centre (TEC) of India has issued a notification on June 23, 2023
MTCTE Release new labelling guidelines- INDIA
MTCTE revised labelling guidelines No.5-10/2021-TC/TEC dated 7/9/2021.
MeitY Introduces Phase VI for CRO – INDIA
The Ministry of Electronics and information Technology (MeitY) of India has introduced Phase VI under the Compulsory Registration Order
Start Date for Security Testing of WiFi CPEs and IP Routers- INDIA
India's Telecommunication Engineering Centre (TEC) has announced that the acceptance of applications, including security testing, for WiFi CPEs and IP Routers on the Mandatory Testing and Certification of Telecommunication Equipment (MTCTE) portal will begin on July 1, 2023.
BUREAU OF INDIAN STANDARDS EXTENDS IS 1293:2019 – INDIA
The Bureau of Indian Standard extended the date of implementation of revised IS 1293 : 2019 superseding IS 1293: 2005 for “Plugs and Socket-Outlets for household
MTCTE: Amendments to Mandatory Testing and Certification – INDIA
The Telecommunication Engineering Centre in the Republic of India has newly issued amendments to obligatory testing and certification of
MTCT Certificate validity extension – INDIA
TEC has increased the validity of MTCTE certificates from 5 years to 10 years to reduce the burden of compliance on the industry. Hence, regular certificates going to be issued after the release
TEC extends mandatory certification of MTCTE Phase III and IV products – INDIA
The Telecommunication Engineering Centre (TEC) of India has modified the MTCTE amendment previously published on January 2022
BIS Issue circular regarding Test reports and Documents – INDIA
The Bureau of Indian Standards (BIS) introduced an amended Circular regarding test reports and documents submitted by an applicant for obtaining a license/inclusion. The Circular concerns products that
TEC issued notification on exception of some devices from MTCTE requirements – INDIA
Based on the notification issued by India TEC on May 24th, 2022. India TEC had exempted the following categories of telecommunication product from MTCTE mandatory testing and certification requirement:
MTCTE Updates – INDIA
TEC issued a notification requiring the submission of Energy Consumption Rating (ECR) test reports for all
DOT Issue Memorandum for importing of wireless equipment – INDIA
Department of Telecommunications (DOT) issued an Office Memorandum regarding importing of wireless equipment for testing under the MTCTE Scheme. Authorized Indian Representatives (AIRs) of foreign manufacturers
Import of Drone under HS Code 8806 prohibited – INDIA
Import of Drone under HS Code 8806 prohibited . The Directorate General of Foreign Trade (DGFT) of India published information about drone importation restrictions.
TEC Amends MTCTE Phases 3 and 4 – INDIA
The Telecommunication Engineering Centre (TEC) of India has amended MTCTE Phases 3 and 4.
India Extends Validity of Energy-Saving Labels for Some Electrical Appliances – INDIA
The India’s Ministry of Power launched the Standards & Labeling Program (S&L) for energy-consumption equipment
WPC Publishes SRD Rules for 865-868 MHz Band – INDIA
The Wireless Planning and Coordination (WPC) wing in India has published the “Use of Low Power Equipment in the Frequency Band 865-868
Mandatory Certification of Telecom Equipment within Phases III and IV – INDIA
Equipment is subject to Mandatory Testing and Certification of Telecom Equipment (MTCTE) procedure led by the Telecommunication Engineering Centre (TEC) of India
TEC Release MTCTE procedure and Labelling relaxation – INDIA
Telecommunication Engineering Centre (TEC) has issued the updated version of MTCTE procedure on May 15th, 2021.
New Unmanned Aircraft System (UAS) Rules – INDIA
Govt. of India notifies new rules for Drones called Unmanned Aircraft System Rules, 2021 effective 12th March 2021
India Starts Testing and Certification Process for Phase V Products – INDIA
Phase V within the Compulsory Registration Order becomes effective in India from April 1, 2021.
Publication of Devices subject to BIS approval – INDIA
Indian Ministry of Electronics and Information Technology (MEITY) released a list of products that are subject for BIS